Project Links
Great Sand Dunes National Park and Preserve » Ungulate Management Plan/EIS » Document List » Document Contents
Public Scoping Comment Summary #2
On September 3, 2014, the National Park Service (NPS) released Newsletter #2 for the Great Sand Dunes National Park and Preserve Ungulate Management Plan and Environmental Impact Statement to the public for review and comment. The newsletter included a letter from Superintendent Carrico inviting public participation and input during the scoping process, a description of the purpose, need, and objectives, and a range of preliminary alternative concepts. The public scoping period was open through November 2, 2014. Two public meetings were held during this time in Crestone and Alamosa, Colorado.
The public comment report available for download below includes analysis of comments received during the public comment period and all comments received by code. The appendix includes all correspondence received.
Document Content: |
Public Scoping Comment Summary #2.pdf
(513.6 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |