Fire Management Plan/Environmental Assessment


The purpose of the Lake Roosevelt NRA Draft FMP/EA is to replace the existing EA by adding project areas for hazard fuel reduction and to revise the operating guidelines for project implementation expanding the use of mechanical methods and the continued use of prescribed fire to accomplish park management objectives
 
Comment Period: Closed        Oct 29, 2014 - Nov 29, 2014
Document Content:
CombinedFile LRNA FMP EA.pdf   (6.6 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.