Project Links
Sleeping Bear Dunes National Lakeshore » Hazard Tree Management Plan Update » Document List » Document Contents
Public Scoping Summary
A summary of public comments received during the scoping period of January 2, 2014 - February 15, 2014 has been posted below. A correction to the summary (correcting the dates recommended for tree management by USFWS) was posted March 18, 2014.
Document Content: |
Public Scoping Summary
(195.7 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |