Parkplanning and PEPC will be offline for Data Center maintenance from 7:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Public Scoping Summary


A summary of public comments received during the scoping period of January 2, 2014 - February 15, 2014 has been posted below. A correction to the summary (correcting the dates recommended for tree management by USFWS) was posted March 18, 2014.
 
Document Content:
Public Scoping SummaryPublic Scoping Summary   (195.7 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.