Mesa Top Waterline Reconstruction


Environmental Assessment (EA) of the proposed Mesa Top Waterline Reconstruction at Carlsbad Caverns National Park. The EA is broken down into 5 parts to make it easier to download. Please refer to the Table of Contents in Part 1 to locate specific sections of the document.
 
Comment Period: Closed        Aug 10, 2013 - Sep 8, 2013
Document Content:
MesaTopCAVE 2   (7.8 MB, PDF file)
MesaTopCAVE   (5.4 MB, PDF file)
MesaTopCAVE 5   (4.8 MB, PDF file)
MesaTopCAVE 4   (12.1 MB, PDF file)
MesaTopCAVE 3   (8.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.