PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Draft Final Marathon County Ice Age NST Corridor Plan and Environmental Assessment


Draft Final Marathon County Ice Age NST Corridor Plan and Environmental Assessment
 
Comment Period: Closed        May 7, 2013 - Jun 14, 2013
Document Content:
Cover   (63.8 KB, PDF file)
Forward.   (126.8 KB, PDF file)
Corridor Plan.   (2.2 MB, PDF file)
FONSI   (162.1 KB, PDF file)
Map 1.1-Statewide   (1.0 MB, PDF file)
Map 2.1 Location   (262.4 KB, PDF file)
Map 2.2 Existing Trail   (1.4 MB, PDF file)
Map 5.1 Corridor North   (714.2 KB, PDF file)
Map 5.2 Central Corridor   (868.9 KB, PDF file)
Map 5.3 Corridor South   (761.4 KB, PDF file)
Map 5.4 Preferred Alternative   (883.4 KB, PDF file)
App Map 1   (190.6 KB, PDF file)
App Map 2   (201.4 KB, PDF file)
App Map 3   (204.6 KB, PDF file)
App Map 4   (192.5 KB, PDF file)
App Map 5   (189.4 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.