Project Links
Delaware Water Gap National Recreation Area and Middle Delaware National Scenic River » Susquehanna to Roseland 500kV Electric Transmission Line » Document List » Document Contents
Record of Decision, Non-Impairment Determination, and final Wetland and Floodplains Statement of Findings
The National Park Service has published the Record of Decision, Non-Impairment Determination, and final Wetland and Floodplains Statement of Findings for the Susquehanna to Roseland 500kV Electric Transmission Line.
Document Content: |
Record of Decision
(229.0 KB, PDF file)
ROD Attachment A: Non-Impairment Determination
(89.2 KB, PDF file)
ROD Attachment B: final Wetlands and Floodplains SOF Attachment A
(14.7 MB, PDF file)
ROD Attachment B: final Wetlands and Floodplains SOF Attachment C
(18.0 MB, PDF file)
ROD Attachment B: final Wetlands and Floodplains SOF Attachment B
(838.5 KB, PDF file)
ROD Attachment B: final Wetlands and Floodplains SOF
(519.3 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |