Project Links
Rock Creek Park » Metropolitan Branch Trail (MBT) » Document List » Document Contents
Metropolitan Branch Trail FONSI
The Finding of No Significant Impact (FONSI) was signed by the National Capital Regional Director on July 3, 2012. It documents approval of the plan and selects the alternative to be implemented.
Document Content: |
Metropolitan Branch Trail FONSI July 3 2012
(732.3 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |