Project Links
Point Reyes National Seashore » Verizon Wireless Proposed Cellular Communications Facility, Point Reyes Hill » Document List » Document Contents
Letter Soliciting Scoping Comments
The letter and the three figures posted below were mailed to the Seashore's mailing list on June 20, 2013.
Comment Period:
Closed
Jun 20, 2013 - Aug 7, 2013
|
Topic Questions: |
1. What issues do you think should be addressed in the environmental review of the wireless communication facility Verizon proposes for Point Reyes Hill? |
2. What alternatives to the wireless communication facility Verizon is proposing should be considered in the environmental review? |
Document Content: |
Verizon Proposal Scoping Letter
(74.8 KB, PDF file)
Figure 1: Vicinity Map
(1.1 MB, PDF file)
Figure 2: Project Features
(649.6 KB, PDF file)
Figure 3: Visual Simulations
(1.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |