Upper Columbia River Site Natural Resource Damage Assessment Plan


The Upper Columbia River/Lake Roosevelt Site has been determined to have been contaminated with hazardous substances including heavy metals, dioxins, and PCBs along a stretch of the Columbia River from the Canadian/United States border downstream to Grand Coulee Dam in Washington State.

The Plan is being released in accordance with the Natural Resource Damage Assessment Regulations found at title 43 of the Code of Federal Regulations part 11. The Plan is the second step in the damage assessment, the goal of which is to restore natural resources injured by the release of hazardous substances . The first step, a pre-assessment screen of various sources of contamination, was completed in 2009.
 
Comment Period: Closed        Aug 6, 2012 - Sep 28, 2012
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.