Categorical Exclusion Trim Brush Along Pedestrian and Horse Trails to Improve Visitor Safety and Accessibility


This project would perform maintenance on the Pedestrian and Horse Trails throughout the Park. Some of the older Deferred Maintenance Work Orders for this Project date back to FY 2003. The work will include but not limited to the following items; Cleaning water bars, waterways, replacing water bars (on a limited basis), and brushing on both sides of the trails, as well as cutting the vertical hazards, minor tread repair and hazardous tree removal. The work would not involve major trail rehabilitation, but focuses on re-occurring cyclic needs. The work will be accomplished to established trail standards.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.