Project Links
Everglades National Park » Acquisition of Florida Power and Light Company Lands in the East Everglades Expansion Area » Document List » Document Contents
x500kV Underground Feasibility Study
This file contains the 500kV Underground Feasibility Study prepared by Patrick Engineering for the National Park Service. NPS asked Patrick Engineering to conduct an engineering analysis of the feasibility of installing 500kV electric transmission lines underground. The study consists of two documents.
UG Study 1 contains the following sections: Executive Summary, Introduction, Technical Feasibility, Economic Feasibility, Future Construction Opportunities, and three attachments.
UG Study 2 contains Attachments 4 - 9. Attachment 9 includes correspondence between NPS and FPL, and FPL's feasibility assessment for undergrounding 500kV transmission lines.
Document Content: |
500kV Underground Feasibility Study 1 of 2
(3.9 MB, PDF file)
500kV Underground Feasibility Study 2 of 2
(6.5 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |