Project Links
Hampton National Historic Site » General Management Plan for Hampton National Historic Site » Document List » Document Contents
Final General Management Plan / Environmental Impact Statement for Hampton National Historic Site
This document includes an analysis of public comments received on the Draft General Management Plan / Environmental Impact Statement (GMP/EIS) with NPS responses and copies of agency comments. No changes were made to the alternatives or the impact analyses presented in the Draft GMP/EIS and Alternative 3 remains the NPS preferred alternative in the Final GMP/EIS. Please review the Errata Sheet for editorial corrections that were discovered after publication of the Final GMP/EIS. The public release of the Final GMP/EIS will be followed by a 30-day no-action period, after which the NPS will prepare a Record of Decision to document the selected alternative.
Document Content: |
Hampton NHS Final GMP/EIS Errata Sheet
(19.7 KB, PDF file)
Hampton NHS Final GMP/EIS: Part 1 (Beginning - Chapter 3)
(5.1 MB, PDF file)
Hampton NHS Final GMP/EIS: Part 2 (Chapter 4 - End)
(4.5 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |