Project Links
Delaware Water Gap National Recreation Area and Middle Delaware National Scenic River » Susquehanna to Roseland 500kV Electric Transmission Line » Document List » Document Contents
Update Newsletter - Susquehanna to Roseland 500kV Transmission Line EIS - Sept 2011
This newsletter reports the status of the Susquehanna to Roseland 500kV Transmission Line EIS being prepared by the National Park Service in cooperation with the U.S. Fish and Wildlife Service. It includes a letter from the superintendents, an update on alternatives being analyzed in the EIS, a summary of completed field studies, and project schedule.
Document Content: |
Update Newsletter - Susquehanna to Roseland 500kV Transmission Line EIS
(4.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |