PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

2011 Final CMP/EA


This plan presents the proposed management actions for approximately 3,000 miles of watertrail on the Chesapeake Bay and tributaries. The Captain John Smith Chesapeake National Historic Trail's long-term management and development will be guided by this plan over the next 15-20 years.

This document describes four different alternative concepts to protect, develop, and manage the National Historic Trail. Alternative 3 has been proposed as the National Park Service's preferred alternative, and this set of actions and programs is intended to become the Comprehensive Management Plan for the Captain John Smith National Historic Trail.

This document also contains an analysis of the impacts and consequences of implementing each alternative. In addition to the planning sections, this document includes a summary of the history of the trail and descriptions of resources associated with the trail.
 
Document Content:
CAJO FINAL CMP Summary and Chapter 1   (14.8 MB, PDF file)
CAJO FINAL CMP Chapter 2 Part 1   (12.4 MB, PDF file)
CAJO FINAL CMP Chapter 2 Part 2   (14.3 MB, PDF file)
CAJO FINAL CMP Chapter 3   (12.5 MB, PDF file)
CAJO FINAL CMP Chapters 4-6   (9.0 MB, PDF file)
CAJO FINAL CMP Appendix A-K   (14.3 MB, PDF file)
CAJO FINAL CMP Appendix L   (11.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.