PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Background Information: 1997 EA for Upper Stehekin Valley Road


In 1995 a major flood wiped out various sections of the Upper Stehekin Valley Road. This Environmental Assessment was prepared to explore options for repairing the last two miles of road.

 
Document Content:
1997 Environmental Assessment   (1012.0 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.