Project Links
Great Smoky Mountains National Park » Construct Joint Curatorial Collections Facility » Document List » Document Contents
Joint Curatorial Collections Facility Environmental Assessment
This environmental assessment examines two alternatives; the No Action Alternative and the National Park Service Preferred Alternative. The Preferred Alternative considers the construction of a Joint Curatorial Collections Facility in Townsend, Tennessee. This facility would serve as a curatorial and storage site for National Park Service museum collections from Andrew Johnson National Historic Site (ANJO), Big South Fork National River and Recreation Area (BISO), Cumberland Gap National Historical Park (CUGA), Great Smoky Mountains National Park (GRSM), and Obed Wild and Scenic River (OBED). The facility will also store and make available archival collections from GRSM.
Comment Period:
Closed
Aug 15, 2011 - Sep 16, 2011
|
Document Content: |
Joint Curatorial Collections Facility Environmental Assessment
(3.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |