Project Links
Everglades National Park » Acquisition of Florida Power and Light Company Lands in the East Everglades Expansion Area » Document List » Document Contents
FPL West Transmission Corridor Details
The file contains:
Chapter 9 from FPL's Site Certification Application presents details on it's West Preferred (proposed exchange corridor) and West Secondary Transmission Corridors. It includes detailed maps and drawings of the proposed transmission lines, pads and access roads planned for this corridor.
* Maps with locations of FPL's proposed West Corridors
* Typical drawings of proposed transmission towers and pads
Document Content: |
FPL West Transmission Corridor Details
(25.3 MB, PDF file)
FPL West and East Corridors Overview map
(149.4 KB, PDF file)
FPL West Corridor Southview map
(1.2 MB, PDF file)
FPL West Preferred Corridor with Underlying Ownerships
(1.0 MB, PDF file)
West Corridor Transmission Line design cross section
(17.0 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |