Parkplanning and PEPC will be offline for Data Center maintenance from 7:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Weinstein permit application revision 2010


"I have attached a word document with the additional (or new, how ever you want to look at it) methods we are proposing for our study of the Biscayne National Park patch reefs.  Ultimately this study will provide a tool to identify potential significant changes to the reef structure over the next 50 years. "
 
Comment Period: Closed        Jun 10, 2010 - Jun 18, 2010
Document Content:
Weinstein proposed permit revisionWeinstein proposed permit revision   (14.2 KB, .docx file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.