Project Links
National Mall and Memorial Parks » Rehabilitate Lincoln Reflecting Pool and Rehabilitate Surrounding Area » Document List » Document Contents
Draft Programmatic Agreement (3-8-2010)
The Draft Programmatic Agreement which includes, but may not be limited to, the structural repair of the Reflecting Pool basin; the reengineering of the Reflecting Pool water delivery and circulation system ; the paving of "social paths" in the lawn along the north and south sides of the Reflecting Pool; the installation of bollards, knee walls and other measures for security on the east side of the Lincoln Memorial; the addition of universally accessible paths; and the rehabilitation of existing pathways, street furniture, and the installation of permanent lighting along the Elm Walks.
Comment Period:
Closed
Mar 8, 2010 - Mar 12, 2010
|
Document Content: |
Draft Programmatic Agreement (3-8-2010)
(270.5 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |