PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Joint Law Enforcement Operations Space with Border Patrol, Park Headquarters, Maintenance, and Visitor Contact Facility


The National Park Service (NPS) is making available for public review an Environmental Assessment (EA) for the proposed construction of a joint NPS-Border Patrol Lake Task Force law enforcement operations facility. The facility would be constructed in the Diablo East Subdistrict of the park at a location currently used to store miscellaneous equipment. The project would address the inadequate facilities the park is currently leasing at multiple locations outside of the park and the associated inefficiencies in park operations. The proposed joint operations facility would improve the effectiveness and efficiency of park operations while providing for improved visitor enjoyment and safety, and protection of park scenic, natural, and cultural resources.
 
Comment Period: Closed        Jan 18, 2010 - Feb 18, 2010
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.