Project Links
Redwood National Park » South Fork Lost Man Creek Forest Restoration » Document List » Document Contents
South Fork Lost Man Creek Second Growth Forest Restoration EA
The environmental assessment describes the proposed action and two alternatives for management techniques to restore second growth forest stands in the South Fork of Lost Man Creek in Redwood National Park. The Finding of No Significant Impact for the proposed action in the EA outlines the main points of the EA and the rationale for selecting the final action for restoration. The project was initiated in summer of 2009.
Document Content: |
South Fork Lost Man Creek Second Growth Restoration EA
(2.2 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |