Project Links
Everglades National Park » Tamiami Trail Modifications: Next Steps Project/EIS » Document List » Document Contents
Public Scoping Report
This document contains a summary of the public comments received during the scoping period.
Document Content: |
Public Scoping Report
(2.6 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |