PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Summary of Alternatives, including NPS Preferred


This is a short 2 page summary of the alternatives, including the NPS preferred alternative identified in the draft plan/EIS.
 
Document Content:
Summary of alternatives   (162.0 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.