Project Links
Grand Portage National Monument » Environmental Assessment: Construct New Maintenance Facility and Seasonal Housing » Document List » Document Contents
Final Draft EA
this is the final draft of the Environmental Assessment incorporating changes from the first public and agency review
Comment Period:
Closed
Sep 21, 2009 - Oct 21, 2009
|
Document Content: |
Final Draft EA
(4.4 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |