PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Final Draft EA


this is the final draft of the Environmental Assessment incorporating changes from the first public and agency review
 
Comment Period: Closed        Sep 21, 2009 - Oct 21, 2009
Document Content:
Final Draft EA   (4.4 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.