Project Links
Ozark National Scenic Riverways » Replace 7 Gas/Diesel Fuel Systems Parkwide » Document List » Document Contents
Categorical Exclusion to Replace 7 Gas_Diesel Fuel Systems Parkwide
Replace 7 existing Gas/Diesel Fuel Systems located at Big Spring, Alley Spring, Round Spring, Akers, Pulltite, Shawnee Shop and Powdermill areas. The new equipment will be multiple double-walled concrete ASTs with interstitial monitoring systems, electronic inventory control measures and audible overfill alarms. All new fuel systems will be replaced on the existing footprint, with the exception of Big Springs, which will be relocated close to the Old Fire Cache within the Big Springs developed area.
Document Content: |
Categorical Exclusion to Replace 7 Gas_Diesel Fuel Systems Parkwide
(302.6 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |