Project Links
Carlsbad Caverns National Park » Reduction in Slaughter Canyon Cave Tours for Summer 2009 » Document List » Document Contents
Improvements to Slaughter Canyon Cave Tour
Proposed changes to the Slaughter Canyon Cave tour schedule to improve visitor experiences. The public is invited to provide feedback on the schedule and tours throughout the rest of the year.
Comment Period:
Closed
Mar 13, 2009 - Dec 31, 2009
|
Document Content: |
Improvements to Slaughter Canyon Cave Tour Schedule
(13.0 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |