Shawnee Shop, Replace Leach Field System


The installation of a new leach field system at Shawnee Shop Maintenance Facility will require the repair/rehab of the existing system which has failed and is not working properly. Project will include the installation of an infiltrator system and tank. No fill material should be required. Entire project is within the existing footprint of the current leach field. Project will upgrade current system to regulatory standards.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.