Project Links
Timpanogos Cave National Monument » Install New Electrical Line » Document List » Document Contents
Public Scoping Letter
This is the scoping letter from the Superintendent that was mailed to park constiuents that includes a description of the proposed action; reasons for taking action; and an overview of the environmental process.
Comment Period:
Closed
Dec 12, 2008 - Jan 12, 2009
|
Document Content: |
Public Scoping Letter
(29.2 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |