Project Links
Ozark National Scenic Riverways » Dixon- Replace Vault Toilet » Document List » Document Contents
Dixon- Replace Vault Toilet
Replace existing vault toilet (bldg. #556). Remove block/concrete structure, including failed Romtec ABS plastic vault. Prepare site and install manufactured vault toilet in same footprint, see attached pictures of existing unit. After installation, a 6" sidewalk will be constructed on 3 sides with adjacent ADA access and parking. All site work will be performed by NPS work crews. See attached proposed location pictures and example of a CXT Gunnison model vault toilet. The new structure will be raised one foot in elevation higher than the current structure. All finish grading will be done to blend into the adjacent terrain to create a natural appearing topography. Exposed soils will be reseeded using a grass seed mix as specified by the landscape architect. No existing tree canopy will be removed.
Document Content: |
Categorical Exclusion for Vault Toilet Replacement at Dixon
(42.9 KB, PDF file)
Dixon Location and Photo of Project Site
(805.2 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |