ID #19482_project_description_PEPC_public


The document contains the purpose, work details, and mitigating measures pertaining to the rehabiliation of shoulders along 1.9 miles of FR 545 from the south entrance to the Sunset Crater Volcano National Monument entrance kiosk.
 
Comment Period: Closed        Mar 28, 2008 - Apr 28, 2008
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.