2008 01Jan 14 - ORV EIS Alternatives Development Public Meeting Presentation


Public meetings were held January 14-18, 2008. At each meeting, Superintendent Mike Murray gave a brief presentation on the ORV EIS Alternatives Development process.

The presentation was converted from MS PowerPoint (.ppt) to an Adobe Reader (.pdf) file, reducing the file size and allowing for a faster download.
 
Document Content:
Presentation   (904.5 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.