PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Finding of No Significant Impact


This Finding of No Significant Impact documents the NPS' decision to implement Alternative B. Minimize Erosion with Bank Barbs and Bioengineering. This alternative is the same as that described in the Environmental Assessment. Specifically, the NPS will construct four rock bank barbs, place large woody debris between the barbs and densely plant native vegetation along approximately 500 linear feet of shoreline. Each bank barb will contain approximately 100 cubic yards of large angular rock spalls and fragments. An additional 100 cubic yards of angular rock will be placed between the barbs and amongst the woody debris to anchor the materials and minimize undermining. The total volume of rock placed along the Stehekin River shoreline will not exceed 500 cubic yards, so as to remain in compliance with the U.S. Army Corps of Engineer's Nationwide Permit #13 (Bank Stabilization).
 
Document Content:
Finding of No Significant Impact   (103.5 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.