Environmental Assessment: Minimize Erosion on the Upper Company Creek Road


This EA evaluates the environmental effects of a proposal to install bank bark barbs and bioengineering to minimize damage to the Upper Company Creek Road.
 
Comment Period: Closed        Sep 26, 2007 - Oct 27, 2007
Document Content:
Environmental Assessment   (1.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.