Going-to-the Sun Road Construction and Maintenance Staging and Stockpiling Site
The area known as Logan Pit in Glacier National Park received a great deal of damage from the November 2006 storms and cut off access to the area until June 2007. The delayed access raised concerns about the continued viability of the area as a staging area for the Going-to-the-Sun Road (GTSR) rehabilitation project, general road materials storage for the park and use as an emergency and administrative helicopter landing site. Logan Pit was identified in the May 2003 Going-to-the-Sun Road Rehabilitation Plan/Final Environmental Impact Statement as the primary staging and stockpiling site for the multi-phase Plan.
The Logan Pit staging and stockpiling site is accessed off the GTSR and is located within a point bar on McDonald Creek. The access road crosses a back bar flood scour channel. During the November event, the water in McDonald Creek flowed through the scour channel and then through the Logan Pit site and access road. Though normally another 100-year flooding event would not be anticipated during the life of this project, the changing weather patterns may result in more frequent flooding, therefore, either alternative locations must be found for staging and storage area or in-stream work must occur in McDonald Creek to prevent water from flowing into the area.
Glacier National Park intends to prepare an Environmental Assessment (EA) to evaluate rehabilitating Logan Pit and performing in-stream work to prevent flooding or utilizing alternative locations. In addition to minimizing impacts on natural and cultural resources at the alternative locations, the other considerations include distance to the project site, size of staging area, and safe access in and out of the staging area. The Western Lands Federal Highway Division will be assisting with developing alternatives.
Comment Period:
Closed
Aug 13, 2007 - Sep 17, 2007
|
Document Content: |
Logan Pit Rehabilitation Scoping ltr for PEPC
(26.5 KB, Word file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |