Scoping Letter


This scoping letter informs the public of the open comment period for the interim management plan. The letter describes the project and includes a list of activties and facilities to be considered in the interim plan. This scoping letter was mailed to the park's mailing list and the tribes prior to the open comment period. If you wish to be added or removed from the park's mailing list, please state that in your response.
 
Comment Period: Closed        Jan 31, 2007 - Feb 28, 2007
Document Content:
Scoping Letter   (97.0 KB, .doc file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.