Lake Mead Intake No. 3 EA


Environmental assessment for the construction of a third water intake structure in Lake Mead
 
Comment Period: Closed        Dec 1, 2006 - Jan 9, 2007
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.