Parkplanning and PEPC will be offline for Data Center maintenance from 7:45 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Eightmile Wild and Scenic River Study Draft Report and Environmental Assessment


This Draft Report summarizes the findings and conclusions of the Eightmile Wild and Scenic River Study and analyzes several alternatives.
 
Comment Period: Closed        Oct 30, 2006 - Dec 8, 2006
Document Content:
Eightmile Draft Report - pt 1Eightmile Draft Report - pt 1   (4.2 MB, PDF file)
Eightmile Draft Report - pt 2Eightmile Draft Report - pt 2   (4.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.