Project Links
Bryce Canyon National Park » Tropic Canyon Highway Stabilization Project » Document List » Document Contents
Tropic Canyon Highway Stabilization Project EA
The EA evaluates the beneficial and/or adverse impacts that highway stabilization activities may have on the natural and cultural resources located in the area of the proposed project. A no action alternative (Alternative A), the agency's preferred alternative as submitted by Utah Department of Transportation (Alternative B), and a modified version of Utah Department of Transportation plans (Alternative C) are outlined in the document. We invite the public to comment on the EA during the next 30 days.
|
Comment Period:
Closed
Jun 23, 2006 - Jul 24, 2006
|
| Document Content: |
|
Tropic Canyon Highway Stabilization Project EA
(1.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |
