Belly River Improvements Enviromental Assessment


May 30 2006
EA analyzing the effects of proposed improvements to utilities at the Belly River Ranger Station Historic District in Glacier National Park.
Two alternatives are analyzed: 1) a No Action, which would maintain the current utility conditions, and 2) a Preferred which is to make improvements to the water, sewer, and propane systems.
 
Comment Period: Closed        May 30, 2006 - Jun 9, 2006
Document Content:
Belly River Environmental Assessment   (4.1 MB, Word file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.