Asheville Corridor Ground-Based Fuel Reduction Flyer + Map


Ground-based mechanical fuel reduction begins in the Asheville corridor in October 2026 and continues through April 2027. The flyer outlines what visitors can expect during this work, and the accompanying map shows the locations of the treatment units in the Asheville corridor.
 
Document Content:
BLRI_Fuel-Flyer 2026-10-01 508.pdf   (9.6 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.