Project Links
Comment period closes
Sep 6, 2026
at 11:59 PM Mountain Time in
Days, Hours, Min.
Sep 6, 2026
at 11:59 PM Mountain Time in
Days, Hours, Min.
Wrangell-St. Elias National Park & Preserve » 2026 Changes to WRST Superintendent's Compendium » Document List » Document Contents
2026 Proposed Compendium Update
The compendium is the summary of park-specific rules implemented under the discretionary authority of the Park Superintendent. It is updated annually and is a written compilation addressing designations, closures, permit requirements, and other restrictions and/or specifications. The Compendium, as part of the park-related regulations, helps provide for the use, enjoyment, and protection of National Park Service units. After review and consideration of the need for annual updates, the following change is proposed:
4.30(i)(1) Designated roads, parking areas, and trails open to electric bicycles, or specific classes of electric bicycles
Current language:
All park roads, parking areas and the following trails, located outside of designated wilderness and outside of the Kennecott Mines National Historic Landmark, are open to the use of electric bicycles.
Trail Creek Trail
Lost Creek Trail
Soda Lake Trail
Nugget Creek Trail
_______________
Proposed New Language:
All NPS managed roads, parking areas, and the trails listed below are open to the use of electric bicycles.
• Trail Creek Trail
• Lost Creek Trail
• Soda Lake Trail
• Nugget Creek Trail
Within the Kennecott Mines National Historic Landmark (NHL), electric bicycles are authorized within the NHL on NPS managed lands from where the NHL Boundary crosses the Kennecott Subdivision Road in the south to the shuttle bus turnaround (adjacent to the Kennecott Visitor Center) in the north. Electric bicycle use beyond the shuttle bus turnaround on NPS managed lands is not authorized.
Electric bicycle use is not authorized in designated wilderness areas.
______________
Why Change is Warranted:
The updated language provides for limited electric bicycle use within the Kennecott NHL. This change allows an additional non-automobile mode of travel for visitors, employees, and residents traveling between McCarthy and Kennecott. This revision supports reasonable access along an existing road corridor without expanding electric bicycle use into sensitive or resource-intensive areas and is consistent with management in other parts of the park.
|
Comment Period:
In Review
Aug 7, 2026 - Sep 6, 2026
Comment period closes
Sep 6, 2026 at 11:59 PM Mountain Time
in:
Days, Hours, Min. |
| Document Content: |
|
2026 WRST Compendium Update_Kennecott NHL Ebike Map.pdf
(1.0 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |
