Project Links
Blue Ridge Parkway » Reducing Wildfire Risk and Restoring Public Access in Storm-Damaged Areas » Document List » Document Contents
Corridor Maps
Maps identify treatment areas where hazardous fuel removal may occur within the following six corridors, subject to further refinement based on ongoing evaluation of operational and resource considerations:
- Galax and Hillsville, 292 acres between milepost 205 and 215
- Laurel Springs, 129 acres between milepost 249 and 267
- Boone, 769 acres between milepost 280 and 300
- Linville Falls, 527 acres between milepost 310 and 319
- Little Switzerland, 325 acres between milepost 324 and 341
- Asheville, 829 acres between milepost 374 and 396
| Document Content: |
|
BLRI_WildfireRiskSites_Geofence_corridor_Milepost 205 to 215_508_2026-0505.pdf
(755.0 KB, PDF file)
BLRI_WildfireRiskSites_Geofence_corridor_Milepost 249 to 267_508_2026-0505.pdf
(802.1 KB, PDF file)
BLRI_WildfireRiskSites_Geofence_corridor_Milepost 280 to 300_508_2026-0505.pdf
(840.9 KB, PDF file)
BLRI_WildfireRiskSites_Geofence_corridor_Milepost 310 to 319_508_2026-0505.pdf
(774.4 KB, PDF file)
BLRI_WildfireRiskSites_Geofence_corridor_Milepost 324 to 341_508_2026-0505.pdf
(811.7 KB, PDF file)
BLRI_WildfireRiskSites_Geofence_corridor_Milepost 374 to 396_508_2026-0505.pdf
(829.9 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |
