Schematic Design for the New Maintenance Storage Facility


Schematic design for the new maintenance storage facility.

The new maintenance storage facility will be compatible with the adjacent historic district. An archeological monitor will be present for all ground disturbing activities.

The public review period is September 24, 2025 through October 24, 2025.
 
Comment Period: Closed        Sep 24, 2025 - Oct 24, 2025
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.