Project Links
Everglades National Park » Rehabilitate Marina Bulkheads at Flamingo » Document List » Document Contents
FONSI Rehabilitate Marina Bulkheads at Flamingo
The Finding of No Significant Impact (FONSI) for the project to Rehabilitate Marina Bulkheads at Flamingo Environmental Assessment (EA) was signed by NPS Regional Director Mark Foust on March 20, 2025.
The FONSI and EA constitute the record of the environmental impact analysis and decision-making process as required by the National Environmental Policy Act.
![]() |
Document Content: |
FONSI_Flamingo Marina_508_March 2025_signed.pdf
(992.4 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |