Project Links
Point Reyes National Seashore » Point Reyes National Seashore and North District Golden Gate National Recreation Area General Management Plan Amendment and Environmental Impact Statement » Document List » Document Contents
*NEW* January 2025 General Management Plan Amendment Revised Record of Decision
This Revised ROD includes a summary of the purpose and need for action; a description of the selected action; a synopsis of alternatives considered and analyzed in detail in the final EIS (FEIS); a summary of agency consultation; the identification of the environmentally preferable alternative and the basis for the decision.
Attachments to the Revised ROD include: Selected Action figures (attachment A), Supplemental Information Report (attachment B), Succession Policy (attachment C), Non-Impairment Determination (attachment D), and errata to the FEIS (attachment E).
Document Content: |
PORE GMPA Revised Record of Decision package January 2025_PEPC.pdf
(35.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |