*NEW* Public Scoping Summary Report (Dec 2024)


This document provides a summary of the scoping period for the Black Canyon of the Gunnison National Park and Curecanti National Recreation Area Grazing Management Plan project. The scoping period took place from August 19th to September 20th, 2024.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.