Kīlauea 3400 Line Relocation Phase 3 Project
In Hawaiʻi Volcanoes National Park (HVNP), Hawaiʻi Electric Light Company (HELCO) owns and operates electrical infrastructure that serves the park, as well as a portion of the island-wide electrical grid that provides electrical service to customers across the Island of Hawaiʻi. As part of ongoing efforts to maintain their system and provide reliable service, HELCO is proposing the Kīlauea 3400 Line Relocation Phase 3 Project (Project) to upgrade and relocate a portion of the 3400 Line located within HVNP. The proposed Project represents Phase 3 of replacing HELCO poles and lines within HVNP and is the final phase of HELCO's initiative to upgrade and harden the 3400 Line on the island. The environmental assessment for this project is linked for review.
Comment Period:
Closed
Sep 23, 2024 - Oct 23, 2024
|
![]() |
Document Content: |
HELCO 3400 Line Ph 3 Draft EA_29Aug2024.pdf
(18.4 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |