Route 10 Zion-Mt Carmel Highway Tunnel Area Road Rehabilitation


The NPS proposes to rehabilitate the east and west entrances to the Route 10 Tunnel, as well as formalize or restore several parking areas east of the tunnel.
 
Comment Period: Closed        Feb 9, 2006 - Mar 15, 2006
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.