Project Links
Jewel Cave National Monument » Jewel Cave Accessibility Self-Evaluation and Transition Plan » Document List » Document Contents
DRAFT Jewel Cave Self Evaluation and Transition Plan
This accessibility self-evaluation and transition plan has been prepared as a collaborative effort between Jewel Cave National Monument staff, Regional Office staff serving Interior Regions 3, 4, and 5, and Denver Service Center staff.
Comment Period:
Closed
Jun 7, 2024 - Jul 7, 2024
|
Document Content: |
JECA_SETP_Draft_6C 2024-0522-508.pdf
(4.1 MB, PDF file)
FINAL 2024 06 JECA SETP IST.xlsx
(138.0 KB, .xlsx file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |