Project Links
Jewel Cave National Monument » Jewel Cave Accessibility Self-Evaluation and Transition Plan » Document List » Document Contents
DRAFT Jewel Cave Self Evaluation and Transition Plan
This accessibility self-evaluation and transition plan has been prepared as a collaborative effort between Jewel Cave National Monument staff, Regional Office staff serving Interior Regions 3, 4, and 5, and Denver Service Center staff.
| 
	Comment Period: 
    
  	Closed       
    Jun 7, 2024 - Jul 7, 2024
 | 
|  | 
| Document Content: | 
| JECA_SETP_Draft_6C 2024-0522-508.pdf
            (4.1    MB, PDF file)
         FINAL 2024 06 JECA SETP IST.xlsx
            (138.0  KB, .xlsx file)
         Disclaimer: Links within the above document(s) were valid as of the date published. Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. | 
