Project Links
Cuyahoga Valley National Park » Rockside Road Bridges Replacement » Document List » Document Contents
Rockside Road Bridge Floodplain Statement of Findings
The Floodplain Statement of Findings (SOF) quantifies the flood hazard associated with the replacement of the Rockside Road bridge over the Cuyahoga River. The Floodplain SOF presents the rationale for the development of the proposed facilities within the regulatory floodplain of the Cuyahoga River, documents the anticipated negative impacts of these improvements on human health/life, capital investment, and floodplain functions and values, and presents mitigations to these impacts.
Comment Period:
Closed
May 29, 2024 - Jun 28, 2024
|
![]() |
Document Content: |
Rockside Road Floodplain Statement of Findings.pdf
(449.7 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |